Sign in
Grouping Problem In Scheduling Flexible Manufacturing Systems
Journal article   Peer reviewed

Grouping Problem In Scheduling Flexible Manufacturing Systems

Andrew Kusiak, Anthony Vannelli and K. Ravi Kumar
Robotica, Vol.3, pp.245-252
1985
DOI: 10.1017/S0263574700002344

View Online

Abstract

In this paper the problem of grouping parts and fixtures in Flexible Manufacturing Systems (FMSs) is discussed. A network formulation of the grouping problem is presented. Based on this formulation an efficient heuristic algorithm is developed. The importance of grouping of parts and fixtures in FMSs as well as some of the computational results are discussed.

Industrial Engineering

Details

Metrics