In this paper, a new approach to the problem of scheduling of design activities with precedence and multiple resource constraints is proposed. In addition to the AND type relationship, OR and EXCLUSIVE OR relationships may also exist between design activities. In order to handle these logical relationships, IDEF3 is used for network representation. A large network of design activities can be arranged in different levels of abstraction. A procedure is proposed to transform an IDEF3 model into a set of alternative precedence networks. In the networks selected, the activities that are resource independent are grouped with a partitioning procedure. In order to increase the efficiency of the search for the best schedule, a procedure based on Christofides et al. reduction procedure is introduced to determine a lower bound on the completion time of the hierarchically structured design activity network.
Journal article
Resource constrained scheduling of hierarchically structured design of activity networks
IEEE Transactions on Engineering Management, Vol.42(2), pp.150-158
05/1995
DOI: 10.1109/17.387271
Abstract
Details
- Title: Subtitle
- Resource constrained scheduling of hierarchically structured design of activity networks
- Creators
- U. Belhe - University of IowaA. Kusiak - University of Iowa
- Resource Type
- Journal article
- Publication Details
- IEEE Transactions on Engineering Management, Vol.42(2), pp.150-158
- DOI
- 10.1109/17.387271
- ISSN
- 0018-9391
- Language
- English
- Date published
- 05/1995
- Academic Unit
- Industrial and Systems Engineering; Nursing
- Record Identifier
- 9983557521602771
Metrics
20 Record Views