The reduction of setup time has a significant impact on shortening manufacturing cycle time. In this paper, characteristics of setup activities are investigated, and models for sequencing setup activities are discussed. Sequencing setup activities can be modeled as a project scheduling problem. Two basic linear programming models for scheduling setup activities are presented. The models minimize the setup time (in particular, the internal setup time), and make a trade-off between the time and cost of setup activities with limited machining resources and budget. Factorial analysis is used to provide insights into the minimization of internal setup time.
Journal article
Scheduling models for setup reduction
Journal of Manufacturing Science and Engineering, Transactions of the ASME, Vol.119(4), pp.A-A
1997
DOI: 10.1115/1.2831189
Abstract
Details
- Title: Subtitle
- Scheduling models for setup reduction
- Creators
- Chang-Xue FengAndrew Kusiak - University of IowaChun-Che Huang
- Resource Type
- Journal article
- Publication Details
- Journal of Manufacturing Science and Engineering, Transactions of the ASME, Vol.119(4), pp.A-A
- DOI
- 10.1115/1.2831189
- ISSN
- 1087-1357
- Language
- English
- Date published
- 1997
- Academic Unit
- Industrial and Systems Engineering; Nursing
- Record Identifier
- 9983557644402771
Metrics
21 Record Views